Traverse TB130 for C.RO Ports
januari 8, 2019Also at C.RO the trains have to be pulled in and the locomotives will travel to the track via the Bemo Traverse. Because the exchange street at the end of the railway tracks has been removed, this saves a lot of space, but also high costs for the construction and maintenance of the exchange street.
The traverse serves 4 set-up tracks and 1 bypass track.
The traverse is equipped with all essential safety features and the train drivers can use this and a semi automatic operation to operate the crossbar easily.