TB100 Traverse taken into use

The new traverse for the Locomotive Workshop Rotterdam has been installed and taken into use. The Siemens Vectron track locomotives are placed on the right track for maintenance by the traverse. The traverse has a load capacity of 100 tons. The traverse serves 2 supply tracks, 6 maintenance / workshop tracks and 8 parking tracks.

Deel dit artikel